Park Road Rising Main Rehabilitation

Hastings District Council

Location

Hastings, New Zealand

Value

$2M +

Completed

2020

Description

Rehabilitation of a 1400m long 375NB RCRRJ rising main by slip-lining. A new 355OD HDPE rising main was inserted into the rising main to extend the life of the asset.

We adopted a number of techniques to install the pipe in a way that minimised impact on the public and was cost effective. Using our customised equipment insertions up to 400m length were made possible. This approach reduced the number of pits and impact on the road users.

We designed and implemented a simple flow management system to maintain flows from the three upstream pump stations, and slip-lined the pipe using our custom built 500kN linear winch.

Expertise

  • Flow management
  • HDPE welding
  • Slip lining
  • Traffic control
  • Mechanical works

Return to all projects

Ready to discuss your project?

pipeline-civil-30-years

Contact

Phone us on +64 9 831 0005
Email us at admin@pipelinecivil.co.nz
Visit us at 23 Airdrie Rd, Ranui, Auckland