Northern Interceptor Package 2

Client

The Fletcher Construction Company Ltd

Client Project Manager

Mike Wall

Engineer to the Contract

David Moore

Design Engineer

Beca

Description

Construction of a new 710OD HDPE Rising main to deliver wastewater from the NORSGA area to Rosedale WWTP.

Our full scope subcontract included the construction of the rising main by open trenching from Greenhithe to Rosedale.

We worked closely with Fletchers  to help optimise the design and deliver the works within budget.

Expertise

  • design
  • open trenching
  • large diameter HDPE
  • in trench butt welding
  • traffic control
  • deep shafts
  • mechanical works