Panmure Rising Main and DPS028 Pipework Replacement
Watercare Services Ltd
Location
Auckland, New Zealand
Value
$10M +
Completed
2018
Description
Construction of a new 900OD HDPE Rising main to replace the aging pipeline crossing below Panmure Basin.
We adopted a number of techniques to install the pipe in a way that minimised impact on the public and was cost effective.
We engaged a specialist directional drilling company to complete two trenchless sections and a specialist installation of HDPE lined concrete pipe with a semi-closed face TBM.
The section of pipe under the Panmure Bridge was installed by slip-lining, using our custom built 500kN linear winch.
Expertise
- Design
- Open trenching
- Large diameter HDPE
- In trench butt welding
- Traffic control
- Directional drilling
- Tunnelling
- Deep shafts
- Mechanical works
Expertise
- Early Contractor Involvement at Design Stage
- CLS watermain construction including cathodic protection
- Air, scour and line valve construction
- Earthworks
- Timber retaining walls
- Site roading and drainage
- Precast concrete building works
- Mechanical, process and electrical works
- Cycleway construction