Glenbrook LVAC Replacement

Watercare Services Ltd

Location

Transpower Glenbrook Substation, South Auckland

Value

$280,000

Completed

November 2022

Description

Ducting and concrete foundations at the Transpower Glenbrook Substation for the LVAC Replacement:

  • Supply and Installation of the new 415V LVAC Auto-Changeover switchboard foundation, Cabinet Support Beam, Lid support assembly and FRP duct lids, including all bolt cage assemblies and hold down anchors.
  • Supply and Installation of the new 415V LVAC supply cable pull pits, FRP lids
  • Installation of new 110OD subsoil drain
  • Trench and lay 150NB PVC ducts/conduits
  • All existing concrete cable trench cut outs and reinstatement to enable installation of conduits
  • Supply and installation of ODJB 622 fibre cable pit and lid, including existing concrete cable trench cut outs and reinstatement to enable installation of fibre cables
  • All earth grid trenches and reinstatement to enable Ventia to install new earth conductor, plus connect to the existing station earth grid, equipment and foundation.

Expertise

  • Working around high voltage electricity in the substation, Transpower Substation Competencies
  • Safe location and identification of buried services, Hydro Excavation
  • Protection and reinstatement of the Earth grid
  • Open trench ducting laying
  • Structural Concrete
  • Structural Steel
  • Chamber construction and installation
  • Subsoil drainage
  • Concrete demolition/modification
  • Reinstatement
  • Project management