Ardmore WTP Rapid Restart Project
Watercare Services Ltd
Location
Auckland, New Zealand
Value
$5M +
Completed
2013
Description
Construction of new overflow capabilities to allow offspec water to be quickly discharged to waste, and then return the plant to normal operation. This required a range of work to be undertaken:
- CLS Pipelaying
- Removal of a section of 1962OD CLS pipe and capping
- Drainage up to 1800NB RCRRJ pipes
- Pipe Jacking using TBM, 1050NB
- Large shafts up to 8m deep
- Insitu Concrete structures up to 6m deep
- Pneumatic actuated penstocks up to 2.5m x 2.0m
- Electrical instrumentation and controls
- Air system upgrade
- Supply of three custom built 3000l air receivers
Expertise
- Earthworks
- Drainage
- Open trenching
- Large diameter CLS pipelines
- Microtunnelled 1050NB pipes
- Manhole construction
- Mechanical and electrical works
- Deep shafts,
- Mechanical works