Our Projects

Recent projects have seen us;

  • Construct a new 508OD CLS watermain and pump station at Albany
  • Laying the Northern Interceptor – a 710OD HDPE rising main in Greenhithe and Albany
  • Designing and constructing the wastewater infrastructure for the Redhills SHA (trunk sewer, pump station and rising main)
  • Designing and constructing a new microtunnelled branch sewer in Massey
  • Upgrade a creek in Hillcrest, including a 4m x 2.5m box culvert
  • Design and construct a 857OD steel pipe bridge and road bridge at Huia
  • Construct 1500m of 508OD CLS watermain as part of the Hunua 4 project