Client
Watercare Services Ltd
Engineer
SKM
Value
$1,100,000
Description
The replacement of the 600NB cast iron pipework inside the Upper Huia Dam
The main challenge on this project was the access to the work site. Traditional cranage methods were not possible, so the construction team developed an innovative solution for transporting materials up the face of the dam (approximately 30m high).
Capabilities
Steel pipe construction, confined spaces, difficult access.