Redhills Wastewater Infrastructure Scheme

Client

Watercare Services Ltd

Client Project Manager

Jason Salmon

Engineer to the Contract

David Moore

Engineer’s Representative

John McCann

Principal’s Engineering Advisor

Harrison Grierson

Contractor’s Designer

GHD
Andy O’Sullivan & Associates

Description

The objective was to deliver a new wastewater scheme to service the Redhills SHA. The project was delivered as a Design and Construct contract under NZS3916:2013.

The scheme included:

  1. A branch sewer in the Redhills valley – 1800m of sewer ranging from 300NB to 750NB
  2.  A 141l/s pump station with underground storage tanks
  3. A 700m long 355OD HDPE rising main, discharging at the high point at Northside Drive.
  4. A 1400m long gravity sewer (400OD/450OD HDPE)
  5. A connection to the existing Massey North DPS069 pump station on Northside Drive

Expertise

  • Design and consenting
  • deep open cut installation of RCRRJ sewers
  • installation of gravity HDPE sewers by HDD to grades as low as 0.5%
  • installation of buttwelded HDPE rising mains
  • traffic control,
  • slope stabilisation
  • deep shafts
  • microtunnelling,
  • road construction
  • electrical and mechanical works