Mahia Branch Sewer Extension Stage 1

Client

Watercare Services – Pieter Maarschalk

Engineer

Opus International Consultants – Eric Thorn

Value

$1,900,000

Description

Construction of 900m of 600NB and 525NB RCRRJ sewer, in the carriageway, at depths of up to 4.5m. The ground conditions were extremely poor and require continuous shoring to prevent collapse and damage to the carriageway.

Capabilities

Deep trenching, continuous shoring, disposal of contaminated material, insitu concrete manhole benching.